|
Science Centre,〔 which had a working name of Don Mills, is a planned underground LRT station on the Toronto Transit Commission's Eglinton Crosstown line.〔(【引用サイトリンク】url=http://www.thecrosstown.ca/the-project/stations-and-stops/don-mills-station )〕 It will be located in the Flemingdon Park neighbourhood at the intersection of Don Mills Road and Eglinton Avenue. It is scheduled to open in 2020. This station's main entrance will be built adjacent to the Ontario Science Centre at the southwest corner of the intersection with Don Mills Road. A secondary entrance will be on the opposite northeast corner, with a new bus terminal stretching beyond that to Gervais Drive. Unlike the other underground stations on the line, this stop will be built in a cut-and-cover tunnel with at-grade stations on either side; a surface station was considered here as well, but given the expected ridership and potential for a junction with a future Don Mills LRT or perhaps the Downtown Relief Line, the underground approach was approved. Destinations include the Ontario Science Centre, the Flemingdon Park neighbourhood, the Celestica headquarters, and the Foresters building. In a report to the TTC Board on it was recommended that stations on Line 5 Eglinton LRT should be given unique names. ==References== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Science Centre LRT station」の詳細全文を読む スポンサード リンク
|